 |
SAVE on skip hire, waste disposal, and landfill tax. Fewer skips and vehicle movements on site reduces both the space required and potential sources of damage.
|
| |
 |
SAVE on aggregate and hardcore deliveries onto site. Produce the grade of fill as and when you need it,instead of waiting for vehicle deliveries - often delayed in traffic - to arrive.
|
| |
 |
SAVE on labour and delays waiting for deliveries to and collections from site. No more breaking concrete by hand with sledge hammers, pick axes or hydraulic breakers.
|
| |
 |
SAVE on time and delays by reducing the number of processes, sub-contractors and suppliers you need to rely on.
|
| |
|
 |
| |
Example job
SAVINGS: |
| |
The figures assume there is the space and access on site for vehicles and skips, which is not always the case. Where access noise and other environmental issues are a problem, then the BAVTRAK 009 may often be the only option.
Job 1:
Clearing a 37m2 (400ft2)
patio or paved area.
Removing 6 tonnes of
concrete by skip £150.
Importing 7 tonnes of
hardcore to site £225.
Labour to shift materials
on & off site £100.
Total job saving using the
BAVTRAK 009 instead: £475 + VAT
Job 2:
Clearing a 180m2
(1946ft2) patio or paved
area.
To break-up and remove
the waste concrete using
a grab lorry, assuming a
rate of £150 per load;
£750.
Bring in 36 tonnes of
hardcore to site £720.
Total job saving using the
BAVTRAK 009 instead: £1,470 + VAT
|
|
| |
 |
|